ACRA CONTROL has a rigorous project management methodology called ‘Project Path’ in place to ensure every project is delivered on time and within budget. The Project Path system is a milestone driven methodology that is proven in aerospace applications. It features an embedded quality process to ensure that projects are managed successfully at every stage. An overview of the stages and their outputs is shown below.
Requirements Definition & Analysis
- User Requirement Definition
- Parameter Review
- Environmental Qualification
- Project Schedule
- Key Milestone Definition
Statement of Work
Architectural Design
- Functional Specification
- Equipment Availability Review
- Obsolescence Analysis
- High Level Design
Preliminary Design Review
System Design
- Cost Benefit Analysis / Sensor and Equipment Selection
- Data Analysis Hardware and Software
- Installation / Interconnect Design Review
- Data Quality Analysis (link budget and network analysis)
- Custom Development Identification
Critical Design Review
Procurement, Development and Unit Test
- Procurement of Equipment - Selection Process for Sub-suppliers
- Management of Custom Developments
- Delivery Management of Equipment
- Environmental and Factory Testing
Unit Test Reports
System Test
- System Test Planning
- Integration Testing
- System Test Procedure
- System Acceptance Testing (bench)
Acceptance Test Reports
Delivery, Training and Support
- Packing and Delivery
- World Class Training Syllabus
- Remote and On-site Support Team
- Documentation
Documentation